North Industrial Park Stormwater 2015-2016

The North Industrial Stormwater Pond is located near an area of dense industrial development and will provide stormwater treatment and detention for both existing and new impervious surfaces. The total drainage area for the project is up to 63 acres.

Project goals:

• Reduce peak stormwater flowrate reductions from the design drainage area in the range of 10 to 30% for the 2 year, 10 year, and 100 year storms which will lessen the peak flood levels on Fountain Lake

• Removal of pollutants such as sediment and phosphorus from stormwater prior to discharge into Fountain Lake

• Reduce impacts to Goose Lake and the Goose Lake wetland complex immediately downstream of the project

Keep posted for more information on this upcoming project.